Welcome To OM Hydropower

OM Hydropower is one of the group companies of the Penna Group, currently executing a 15 MW project at Palampur Himachal.
As per the current regulations of the pollution control board, 15% of the lean discharge of the river is to be allowed to flow at all times.
The lean discharge is to be measured by a discharge measurement system on line.

15
MW Capacity
5.52
Cumecs Discharge
398m
Net Head
Green Valley Micro Hydro
Hydroelectric dam with water discharge — run-of-river project
15MW
Power Generation
General Project Features

Neugal Hydroelectric Project

Neogal Hydroelectric Project has been contemplated as a run off the river scheme on Neogal khad, a tributary of river Beas in Kangra Dist. of Himachal Pradesh India. Power House of this project is located near Darklu Village near Palampur for generation of 15 MW of Power.

Learn More
Key Features

Project Highlights

Key technical specifications and features of the Neugal Hydro Electric Project

Ogee Weir

An Ogee weir across Neugal Khad to divert a maximum discharge of 5.52 Cumecs.

Desilting Tank

A Desilting tank located just downstream of the Intake Structure.

Head Race Tunnel

3.178 km Long Head Race Tunnel (2.25M x 2.25M D-shaped) to carry design discharge of 4.6 Cumecs.

Surface Penstock

A surface Penstock mtr. Dia,+ 664 mtr. Long feeding a surface power house operating under a net head of +398 mtr.

33 KV Switch-yard

An outdoor 33 KV Switch-yard together with a 12 km long transmission line wheeling power to the nearest Sub-Station of the HPSEB at Dehan (Palampur).