Ogee Weir
An Ogee weir across Neugal Khad to divert a maximum discharge of 5.52 Cumecs.
OM Hydropower is one of the group companies of the Penna Group, currently executing
a 15 MW project at Palampur Himachal.
As per the current regulations of the pollution control board, 15% of the lean discharge of the river is to be allowed to flow at all times.
The lean discharge is to be measured by a discharge measurement system on line.
Key technical specifications and features of the Neugal Hydro Electric Project
An Ogee weir across Neugal Khad to divert a maximum discharge of 5.52 Cumecs.
A Desilting tank located just downstream of the Intake Structure.
3.178 km Long Head Race Tunnel (2.25M x 2.25M D-shaped) to carry design discharge of 4.6 Cumecs.
A surface Penstock mtr. Dia,+ 664 mtr. Long feeding a surface power house operating under a net head of +398 mtr.
An outdoor 33 KV Switch-yard together with a 12 km long transmission line wheeling power to the nearest Sub-Station of the HPSEB at Dehan (Palampur).