Project Highlights
- Ogee weir across Neogal Khad to divert a maximum discharge of 5.52 Cumecs.
- A Desilting tank located just Down Stream of the Intake Structure.
- 3.178 km Long Head Race Tunnel 2.25 M x 2.25 m D — shaped to carry design discharge of 4.6 Cumecs.
- A surface Penstock 1.30 mtr. Dia, + 664 mtr. Long feeding a surface power house operating under a net head of + 398 mtr.
- A outdoor 33 KV Switch-yard together with a 12 km long transmission line wheeling power to the nearest Sub-Station of the HPSEB at Dehan (Palampur).